It’s all Change at Grenville House

It’s all Change at Grenville House

The back yard will become a building site starting on October 3rd 2016 when the old ‘non-resident’ building will be demolished to make way for our brand new changing rooms. As of May 2017 all of our clients will be able to change and shower in the comfortable surroundings of our shiny new facility.

There will be four rooms able to accommodate 3 activity groups i.e. 18 people, 2 staff changing rooms ( 1 male and 1 female), plus a mobility changing room. Each room will have toilets and shower cubicles with underfloor heating. Lighting will be via skylights in the roof.

We selected both a local architect who has designed the building to blend in with the the rest of the site whilst looking stylish and a local builder to carry out the demolition and construction works.

This is an extremely exciting project that will improve the experience for everybody staying with us and we look forward to you using it.

This £300,000 project is fully funded by the Charity so any support towards this would be warmly welcomed. If you are able to help in any way please contact us at the Centre.